Blog Absence
How much holiday does somebody who joined in March have?
The sum is a ratio. What makes it hard is rounding, working days against calendar days, and sickness, which happen to be the three things a spreadsheet carries over badly from one year to the next.
The pro-rata, and the bit the law leaves open
Somebody who has not worked the full year is entitled to the proportional share. Annual days divided by twelve, multiplied by months worked, or divided by 365 and multiplied by days if you want it to the day.
- Joins 1 March on 22 working days a year: 22 ÷ 12 × 10 = 18.33 days.
- Joins 15 March, counted by day: 22 ÷ 365 × 292 = 17.6 days.
- Leaves 30 June having taken 12: accrued 11, so one day was taken in advance and it settles on termination.
Rounding is a policy, not a calculation
Statute rarely says how to round 18.33. Either the collective agreement does, or the employer picks a rule — upwards, to the half day — writes it down and applies it to everybody. A rounding rule that changes depending on who asks is a claim waiting for two colleagues to compare notes.
Working days and calendar days are not interchangeable
Spanish law sets the floor at thirty calendar days, weekends and public holidays included. Most collective agreements restate that as twenty-two working days, which is more generous rather than equivalent, because the weekends inside the period stop being counted.
The practical consequence is that a tool has to hold a balance in the unit the agreement uses, and deduct in the same unit, without anybody converting anything by hand. Mixing the two is the single most common source of a leave balance that nobody trusts.
Cash instead of leave: no
While the contract is live, Spanish holiday cannot be replaced by payment, traded for extra hours worked, or banked in exchange for an allowance. The only exception is termination, where accrued and untaken leave is settled in the final payment.
Carry-over and the two sickness exceptions
The general rule is that leave lapses with the year it accrues. Spain carves out two exceptions, and both force a balance to cross the year end:
- Sickness related to pregnancy, childbirth or breastfeeding, and the suspension periods of article 48.4, 5 and 7: the leave is taken on another date even after the calendar year has ended.
- Any other temporary incapacity that prevents the leave being taken within the year: it can be taken once the sickness ends, provided no more than eighteen months have passed since the end of the year in which it accrued.
Sickness that lands inside a holiday
Those days are not lost. The holiday is interrupted and the days are recovered later, under the limits above. Which means the tool has to be able to split an approved holiday in two rather than delete it and have somebody re-enter it, because a deleted request takes the approval trail with it.
Five things the tool has to get right
- Both units at once, so the balance comes out in the unit the agreement uses.
- Half days. An afternoon off is an afternoon, not a day and not nothing.
- Local public holidays. A day that is not a working day in Madrid does not spend leave for somebody in Madrid, and does for somebody who is not.
- The balance at a date, not just the year total: the real question is how many days are left on 31 August with approved and requested days deducted.
- Carry-over with its reason attached, so that a year later anybody can see why that person had four extra days.
Frequently asked questions
Thirty calendar days or twenty-two working days?
The Spanish statutory floor is thirty calendar days. What applies is whatever the collective agreement says, and the usual restatement as twenty-two working days is better than the floor rather than equal to it.
Can untaken holiday be paid instead?
Only on termination, where accrued and untaken leave is settled in the final payment. Not while the contract is in force, even if both sides want it.
Does holiday expire on 31 December?
As a rule, yes. The exceptions are sickness: pregnancy, childbirth and breastfeeding with no year limit, and any other temporary incapacity with a limit of eighteen months from the end of the accrual year.
All of this is built into Fichaloto. See how it works.
Keep reading
How to choose
Twelve questions worth asking before you sign
None of these twelve questions is technical. Every one of them is answered in a sentence, and you can ask for the answers in writing before signing anything.
Compliance
A clocking record that cannot be quietly rewritten
Most time-tracking tools store hours in a table anyone with database access can edit. That is fine until the day somebody asks you to prove a number.
Capacity
Planned, clocked, charged: three numbers that should match and usually do not
Most companies can tell you what they planned and what they invoiced. Very few can tell you, for a given week, whether those two things are related.