Architecture practices
Project and team management for architecture practices
In a practice the fee is agreed at the start and the hours are discovered at the end. Fichaloto shows the gap while there is still time to do something about it.
What it solves in a practice
Everything on the same database, with no spreadsheets to reconcile at month end:
- Stages with their own dates — concept, planning, technical design and site supervision, with committed dates even before any task exists.
- Real hours against plan, by stage — so you can see which stage is eating the fee.
- Fixed milestones — submissions and deliveries as dates that do not move.
- Margin per commission — with each person’s cost and the expenses that are not hours.
- Workload before each deadline — who is fully booked and who can take the next job. Capacity planning.
Client changes, with a number attached
With the hours of each stage in front of you, “one last change” stops being an opinion and becomes a figure. It does not guarantee you get paid for it, but it changes the conversation — and it gives you the data to quote the next job without guessing.
What it is not
It is not CAD, BIM or a full ERP. It sits alongside the tools you already design with.
Frequently asked questions
Is it worth it for a small practice?
From around five people working on commissions at the same time. Below that, a well-kept spreadsheet is usually enough.
Can fees be tracked by stage?
Yes. Stages have their own dates and hours are logged against them, so each stage can be compared with what was planned.
What about external consultants?
Their invoices go in as project expenses and count towards the margin alongside the team’s cost.
Getting started
Fourteen full days, no card and nothing to install. If it has not saved you work by then, there is nothing to cancel. And if you would rather see it first, book a demo and we will set it up with two or three of your real projects, which is where you find out whether it fits.