Fichaloto

Recruitment

A careers page of your own, without a second website

Fichaloto gives every company its own public careers page, with its name, its colour and its address. You publish the roles you want, people apply from there, and what they send lands straight in your talent pool with the CV attached to the record. Nothing to type, and no extra site to maintain.

Receiving CVs is not the problem. What happens next is.

A twenty-person company that opens one role gets forty applications in a fortnight. They arrive in an inbox, sometimes two. Someone files them in a folder, someone replies to a handful, and three months later — when a similar role opens — nobody knows where last time’s good ones went.

The real cost is not the time spent reading them: it is that the whole search is thrown away, and the next one starts from zero.

How it works

Tick a box, choose an address, and the page exists. Everything after that is deciding what goes on it.

  • Your address. fichaloto.com/en/jobs/your-company, and its Spanish twin. It is what you put on LinkedIn, in your email footer and in any advert you pay for. It does not expire and it does not change when you rewrite the copy.
  • Your look. Your logo and your colour. The rest of the page stays deliberately neutral: a careers page has to be readable, not dazzling.
  • Only the roles you say. Every opening has its own switch. An internal promotion stays inside; one you pause stops receiving without ceasing to exist.
  • Search and filters by work setup, location, contract and hours, appearing on their own from five vacancies up. Below that they are noise.
  • Open applications, if you want them. At the companies that switch them on, that is where the best hires come from.

What comes in, comes all the way in

Whoever applies becomes a candidate in your talent pool and an application against that role, with their CV attached to the record and their letter in the history. Whoever runs the role gets an email and a notification in the app. Nobody copies anything from an inbox into a spreadsheet.

And nobody gets duplicated: if that email address is already in your talent pool, any gaps are filled in and whatever someone inside corrected by hand is left alone. Applying twice for the same role does not create two applications; the second letter is recorded in the history.

It shows up in Google Jobs, not on a page nobody finds

Every vacancy is published with its JobPosting structured data, which is what puts it into Google’s job results, and enters the sitemap the same day. Without that it would take weeks to be crawled, and for a role that runs for a month that is the same as not publishing it.

When a role closes, its address answers that it is gone — not a pretend 200 — so search engines retire it without penalising the ones still open. Whoever opens the old link is shown the roles that are live.

Bots, without a captcha

The same control as the form on this site: two fields a person cannot see, the form signed with the time it was drawn, a cap on submissions per address and a check on what is written. Whatever is discarded is told it went through — telling a bot which trap it tripped teaches it to come back tomorrow — and the reason is recorded without keeping anything it carried.

Nobody has to solve a puzzle of traffic lights to send you a CV.

And the consent wording is yours

You write the text the candidate accepts, and it is stored with their record exactly as it was worded on the day they accepted it, with the date and where from. The retention period you set is stated on the form itself. That is what turns “we had their consent” into something you can actually show.

Frequently asked questions

Do I need a website to have a careers page?

No. The page lives in Fichaloto and works on its own: you can have no website at all, or have one and link to it. If you put your website address in the settings, a link back appears in the careers page header.

Does it post to LinkedIn or the job boards?

No. Posting to an external board takes a commercial agreement with each one, and we would rather say so than imply otherwise. What it does is give you your own page, put you in Google Jobs, and record where every candidate came from, so you know which channel is actually working.

Do I need a full ATS for this?

That is the point: you do not. The careers page comes with the Recruitment block, and that block sits inside the tool where the person ends up working — with their role, their project allocation and their hours — instead of handing you one more system to reconcile.

Can I ask for an ID document on the form?

You can, but it is off by default. It helps avoid duplicating someone who applied before, and at the same time plenty of people will not hand it over up front: if you get few applications, asking will cost you some. It is your call and it is one checkbox.

Is the salary range visible?

Only if you switch it on. The range lives on the opening to work out the cost of whoever joins, and showing it publicly is a separate decision. Switch it on and it also goes into the data Google reads, which is where it makes the most difference.

What happens if we stop paying for the module?

The page stops answering and the roles stop being visible outside, but nothing is deleted: not the page, not its address, not the applications received. Switch it back on and it is all exactly where it was, on the same address.

Getting started

Fourteen full days, no card and nothing to install. If it has not saved you work by then, there is nothing to cancel. And if you would rather see it first, book a demo and we will set it up with two or three of your real projects, which is where you find out whether it fits.

What we have written about this

Keep reading