Compliance
One screen that tells you whose mandatory training has expired
An auditor never asks whether you run training. They ask you to show who has it and since when. Fichaloto answers with a compliance figure, the named list of everyone who is overdue, and a per-person certificate that can be checked from outside without calling anyone.
Why the training matrix in a spreadsheet always ends up lying
It fails in the same three places every time. One: one person maintains it, and the week they are away nobody does. Two: it does not hear about joiners and leavers, so the person who started in March is missing and the one who left in January still counts. Three: it cannot expire anything, so a cell that said «done» in 2023 still says «done» today.
The result is a percentage nobody quite believes, and an afternoon of work every time somebody asks for it seriously.
One figure, and the call list underneath it
The compliance screen shows the share of mandatory training that is completed and still valid, and below it the named table: each person with whatever they have overdue, expired or failed. Filter by team, by site and by course, and what is left is exactly the list of people to call.
The table downloads to spreadsheet or CSV exactly as filtered, so the appendix to an audit report is two clicks rather than copying rows by hand.
- Mandatory compliance. Courses marked as mandatory, completed and still valid, over everything assigned. This is the number you show outside.
- Who is falling behind. Overdue, expired or failed, with the name, the course and the date.
- What expires soon. Still valid but not for long, which is when acting is cheap.
- A record per person. Everything of theirs on one screen: assigned, completed, marks, dates and certificates.
- Certificate list. Filterable by course and downloadable, with the verification code on every line.
Expiry is handled by the product, not by a person
Each course declares its validity in months. When the date arrives the enrolment expires on its own and, if a live assignment rule still covers that person, they are enrolled again on a fresh cycle with its own deadline. The previous cycle stays whole, mark and certificate included.
Nobody has to remember anything, and nobody has to delete the old row to make room for the new one: both live side by side, which is what any audit that looks backwards needs.
Evidence that can be checked without taking your word for it
A PDF certificate is worth exactly as much as the reader's trust in you. Fichaloto's carries a short code and a QR: whoever receives it opens the public verification page, types the code, and the system itself says whether it is genuine, whose it is, which course and which date. No account, no permission needed.
That changes the conversation in an audit, or with a client who requires accredited training from contractors: instead of sending a folder of PDFs and asking them to trust you, you send a list with the codes and let them check.
What Fichaloto is not
Fichaloto does not deliver training and does not accredit anything on its own account: it is not a training provider and not a health and safety consultancy. The certificate evidences that your company delivered that course to that person on that date, which is exactly what has to be provable.
Nor does it tell you which training is mandatory in your case: that depends on your sector, your activity and your risk assessment, and your own adviser is the one who says. What Fichaloto does is make sure that, once it is known, nobody falls off the list.
Frequently asked questions
Does it work as evidence for a labour inspection or an audit?
It works as a record of the training your company delivered and who completed it, with dates and a verifiable certificate. It does not replace your health and safety adviser's documentation and it does not decide which training applies to you: that comes from your risk assessment. Check it with your own adviser, who knows your case.
What about somebody who joins mid-year?
If a live rule covers their team, their site or their job title, they are enrolled the day they join, with the deadline counted from their own start date. Nobody has to remember.
And classroom training delivered by somebody else?
It is recognised from the person's record: it counts towards compliance and it expires like the rest. A recognised course produces a certificate with no grade, because the grade would belong to an exam that was not taken here.
Can we export the whole matrix for a tender or a prequalification?
Yes. The compliance table and the certificate list download to spreadsheet and CSV with the filters applied, and every line carries its verification code. They are also available as a custom report and through the API.
Does it remind people?
Yes. Whoever is assigned a course sees the notice in the application, and whoever runs training has what is about to expire on the dashboard and can receive it every Monday by email alongside their other cards.
Getting started
Fourteen full days, no card and nothing to install. If it has not saved you work by then, there is nothing to cancel. And if you would rather see it first, book a demo and we will set it up with two or three of your real projects, which is where you find out whether it fits.