Fichaloto

Time tracking

GPS clock-in, with the radius you decide

Every work centre has its coordinates and its radius. When someone clocks, the location is compared against that radius and the exact distance is stored. You can refuse the clock-in from outside or let it through and flag it — and we will tell you why the second is almost always better.

Exactly what gets stored

For every entry — clock-in and clock-out separately — we record the IP and the city that IP gives away, and, when the location check is on, the coordinates, the nearest centre, the exact number of metres you were from it and whether that falls inside or outside the radius.

And the verdict is stored, not the means of recomputing it. If you move the centre or change the radius tomorrow, what was clocked yesterday does not change its verdict: the opposite would be rewriting the past, and this ends up in front of an inspector.

Block or flag: the decision most people get wrong

The first instinct when setting this up is to block: if you are not at the office, you do not clock. It sounds right and it works badly.

The salesperson at a customer's office cannot clock. Neither can the one on site with two bars of signal. The person with the temperamental GPS on an old phone can sometimes and sometimes not. And all of them end up ringing whoever administers the account to have their day fixed by hand — which is precisely the work you were trying to remove.

Flagging gives you the same information and strands nobody. The entry goes in, comes out with its distance beside it and shows up in a filterable "outside the site" list you review in two minutes. If there really is a problem you see it just the same; and if it was the signal, it cost nobody their day.

The radius belongs to the centre, not to the company

An office does not need the same margin as a building site. A hundred metres is plenty for a building; on a site or a large industrial estate you want five hundred, because the signal is worse and the point the browser gives you wanders more. Each centre sets its own, and any centre that does not uses the account's.

In a group with several legal entities, each one can tighten on its own — require a location the account does not require, or set a shorter radius — but cannot loosen what the account says.

Clocking out is never blocked

Someone already clocked in has to be able to close their day even if they have gone out on an errand, a delivery or home. Leaving their entry open protects nobody and costs them the whole day, because an entry with no clock-out counts as zero hours worked. We record that they clocked out from outside the site, and that is what gets reviewed.

Frequently asked questions

Where do I get the coordinates of my office?

From Google Maps: right-click the spot and copy the two figures at the top. You can paste both together into the latitude field and Fichaloto splits them.

Is it lawful to require a location in order to clock in?

Location at work is processing of personal data and comes with rules: you must inform staff and their representatives what is recorded and why, the processing has to be proportionate to the purpose — checking presence at the site, not following anyone — and it cannot be reused for something else. Fichaloto stores the location only at the moment of clocking and never in between: there is no continuous tracking, and no screen that would show it. That said, this is information and not legal advice: check it with your employment adviser before switching it on.

What if someone denies location permission in the browser?

If the account is set to "from anywhere", they clock as normal and only the IP is recorded. If it is set to "only from a centre", they cannot clock and are told why and what to allow. That is the only situation where a clock-in is refused for want of a location.

Can we see where somebody is at any given moment?

No, and that is a decision rather than a limitation. Only the location at the instant of clocking in and clocking out is stored. In between, nothing is recorded, nothing is asked of the browser, and there is no screen that shows anyone's position.

Getting started

Fourteen full days, no card and nothing to install. If it has not saved you work by then, there is nothing to cancel. And if you would rather see it first, book a demo and we will set it up with two or three of your real projects, which is where you find out whether it fits.

What we have written about this

Keep reading