Fichaloto

Blog Recruitment

Where to post a job opening when you are not a multinational

8 min read

Post it on your own careers page first, and share that link everywhere else. It is free, it goes into Google Jobs, and it is the only place where what you receive stays with you once the role is closed.

The four channels, and what each one costs

For a company of ten to a hundred people there are four places a role ends up. They do not compete: you use them together, in this order.

  • Your own careers page. No cost and full control. It is the address you put everywhere else, and the only one still yours in the months you are not hiring.
  • Google Jobs. You do not post “to” Google Jobs: you post on your own page with the right structured data and Google picks it up. It is free traffic from people searching for exactly that role in exactly that place.
  • LinkedIn. A promoted job runs into hundreds a month; sharing your careers page link from your profile and asking three colleagues to do the same costs nothing and, at a small company, usually brings more.
  • Paid boards (Indeed and friends). They bring volume and they bring noise. Worth it for common, highly-searched roles, much less so for an unusual one where what you need is five good candidates rather than a hundred and twenty.

The sum almost nobody does

A posting on a paid board costs what the ad costs. But the cost that never shows up on the invoice is this: when you close the role, the subscription ends and the forty CVs you received stop living anywhere useful. The three or four you almost hired — the ones who would have been perfect six months later — go with them.

Next time you pay for the ad again, and read forty CVs again, some of which are literally the same ones.

Posting on your own page first does not rule out the ad when you need it. What changes is where what arrives lands: in a talent pool of your own, with the history of why each person was set aside, which is what lets the second search start halfway through.

What your page needs to actually work

A bad careers page is worse than none: it sends people to a form that does not work and leaves the impression of a disorganised company. Five things, and none of them is about design.

  • An address that does not change. It gets shared in messages and sits on other people’s profiles for years. If it changes, the link dies.
  • JobPosting structured data. Without it you do not enter Google’s job results, and for a role that runs a month, waiting to be crawled is the same as not posting.
  • A one-minute form. Name, email, CV and four lines. Every extra field costs you candidates, and the first to leave are the ones who already have a job.
  • It has to answer. A form that swallows a CV in silence is the number one reason people send it three times and then phone.
  • Closed roles must say they are closed. An old link showing a blank page — or worse, pretending everything is fine — costs you with search engines and strands whoever opened it.

Consent, in two sentences

Keeping someone’s CV means processing their personal data. Three things are needed, and all three fit on the form itself: tell them what you will use it for, tell them how long you will keep it, and store the wording they accepted exactly as it read that day.

That last one is the one almost nobody does and the only one that helps when someone asks two years later. If your form has changed since, showing today’s wording proves nothing.

An order that works

For an ordinary role at a small company:

  • Post it on your page. Five minutes, and it is already on its way to Google Jobs.
  • Share the link from your LinkedIn and ask three people on the team to share it too. This is what works most and gets done least.
  • Send it to your industry group or association, if there is one. The best candidates for an unusual role almost always come from there.
  • And if two weeks later you have nobody, then pay for the ad — with your own page link inside it, so what arrives ends up where it should.

Frequently asked questions

Do I need a website to have a careers page?

No. It can live inside your HR tool and work on its own, with its own address. In Fichaloto it is a checkbox: switch it on, choose the address, and the page exists, with your name and your colour.

How long does Google take to show a vacancy?

From a few hours to a few days, if the page carries the structured data and enters the sitemap the same day it is published. Without those two it can take weeks, which for a one-month role is the same as not appearing.

Are open applications worth anything?

At the companies that switch them on they are, by some distance, where the best hires come from: these are people who want to work there specifically, not people carpet-bombing CVs. They cost one form and nothing else.

How long can I keep a CV?

As long as you said on the form and can justify. A year is a common and reasonable period for a recruitment process; what matters is saying it up front and sticking to it, not the exact number. We are not lawyers: if you have doubts about a specific case, take advice.

All of this is built into Fichaloto. See how it works.

Keep reading