Fichaloto

Blog Security

Five fields, written at the moment you grant it

6 min read

Recording access takes thirty seconds when you grant it and an afternoon when you try to remember it.

The five fields

An access register that works does not need to be a project. It needs five facts, written at the time, readable without interpretation.

  • Which system. By its real name, not «the panel». In a year nobody will know which panel that was.
  • What kind of credential. Own login, shared account, API key, technical credential. This determines how it gets revoked, and each type is revoked differently.
  • Who authorised it. Not for bureaucracy: because when it comes time to decide whether to remove it, you need to know who to ask.
  • When. The date alone tells you a lot. Access granted two years ago to a tool you no longer use stands out just by scanning the column.
  • Until when. The field almost nobody fills in and the one that saves the most. Blank means open-ended, and open-ended should sting slightly to write.

Where it has to live

Next to the person's record. Not in a separate document, not in a shared sheet, not in a password manager.

The reason is purely practical: a standalone document stops being updated in month two, because nobody opens it during normal work. You open the record of someone you work with when you change their role, when they book leave, when you offboard them. If the register is there, you see it without looking for it — and above all you see it on the day you process the leaver, which is exactly when it is needed.

Today, while your tool has no dedicated place for this, the notes field on the person's record does the job perfectly well. It is not elegant. It is infinitely better than memory.

What the product does register on its own

Worth separating two things that get confused constantly, because the tool handles one and you handle the other.

What Fichaloto records by itself is everything that happens inside: every creation, amendment, approval and deactivation lands in the audit trail with the person, the date and what changed. And for API access, keys are revocable in one click, accept an expiry date, and stop working on their own if the person goes inactive.

What no tool can record for you is the access you granted outside: the FTP, the hosting panel, the third-party account. You granted that somewhere else, and it exists only where you write it down. That is the part you carry by hand, and it is precisely the part that bites during offboarding.

Frequently asked questions

Is this not just a password manager?

No. A manager stores credentials so they can be used; the register documents access so it can be closed. They overlap surprisingly little: there is access with no password to store — a federated login, a key only its creator ever saw — and stored passwords for things that are nobody's access in particular.

Is it worth it if we are six people?

With six people and no external contractors, probably not. It starts paying the moment the first freelancer arrives, because that is when technical access gets granted piece by piece with no plan behind it — the kind that is impossible to reconstruct later.

What if I have two years of unrecorded access already?

Do not try to reconstruct the whole past: you will get it wrong and abandon it halfway. Start recording everything new from today, and do one single pass over the critical systems — hosting, database, domains — looking at who appears in their user list. That covers most of the real exposure.

All of this is built into Fichaloto. See how it works.

Keep reading