Fichaloto

Blog Working with clients

The client asks how their project is going. What do you show them?

7 min read

There are three possible answers and two of them are bad: the Friday email written by hand, which stops going out around March, and a full account login, which shows things it should not. The third is a narrow window they can look through whenever they want.

Why the Friday email always dies

It starts well. Somebody spends twenty minutes on a Friday writing up where the project stands, what has been closed and what is coming. The client appreciates it, and for six weeks it looks like the problem is solved.

Then comes a week with a delivery in it, and the email goes out on Monday. Then a week with annual leave, and it does not go out at all. By the third miss the client has learned that the way to find anything out is to ask, and asking is a phone call that interrupts you. The manual report does not fail because it is badly written. It fails because it depends on one specific person having a quiet morning.

And why giving them the whole account is worse

The instinct is to go the other way: «I will set them up with a login and let them look». The trouble is that in most tools a login sees the account, and the account holds everything else.

  • Your other clients. A competitor of theirs sitting in your project list is a conversation you do not want to have.
  • What you charge. If they can see your team's cost per hour, the next negotiation starts from there.
  • Your headcount. Who is allocated, at what percentage, and with what absences. That is employment information about third parties, and it is not theirs.
  • What they can move without meaning to. A client who drags a card across the schedule because they thought it was a reading list has just changed your plan.

What a client actually wants to know

Less than people assume. Across fifteen years of time-and-materials work, what a client asks fits into four questions:

  • Are we going to make it? Milestone status and dates.
  • What is waiting on me? Whatever is blocked and sitting on a decision of theirs.
  • How much have we used? Of the budget, or of the block of hours.
  • What has happened since last time? Without a breakdown of who did it or how long each person took.

The narrow window

The answer that works is access showing exactly that and nothing else: their projects only, read-only. Not what you charge, not your team, not the rest of your book of business.

In Fichaloto that is a role that ships with the product — Client — and it is fenced in by design: whatever permissions you hand it, it only sees the projects you tick, and with an empty list it sees none. It is read-only with no exceptions, so there is no way for them to move anything by accident. How to give a client access.

The practical difference from the Friday email is not the twenty minutes saved. It is that the client stops ringing to ask, because looking costs them less than calling you.

Three things worth settling before you grant it

None of them technical. They are all about the client relationship, and they get answered in one meeting:

  • Which projects. If you run four for them, they may only want to watch two. The list is per person and you can change it whenever you like.
  • Who on their side. Their project manager and their procurement lead do not need the same thing. One login per person is easier to withdraw than a shared one, and it tells you who actually looked.
  • When it gets withdrawn. At project close, and better decided on the day it opens. Client access still live three years after the last engagement is the one that turns up in the audit.

Frequently asked questions

Would sending a PDF not be easier?

For you, yes, the first time. Not by the fourth, and by then the client has learned that information arrives when you can manage it. Read-only access is granted once and then keeps itself going.

Can the client see the hours each person on my team has booked?

No. The client role does not reach the team screen or any cost figure. It sees the project and its tasks, which is what concerns them.

What if I want them to be able to write too — raise issues, say?

That is no longer a client watching: that is somebody working on your project, and the guest collaborator role is what covers it. It writes, and it is still fenced to the projects you tick.

What does it cost to give a client access?

They take up a person slot in your account, like any other user. It does not force you to add modules: a client on the base product sees everything they need to see.

All of this is built into Fichaloto. See how it works.

Keep reading