Working-time record
Getting off paper timesheets without running a project
The signed sheet is not illegal. The problem is different: when somebody asks for the records from two years ago, paper does not answer.
What the signed sheet is faulted for
A paper record meets the letter of the obligation: there is a daily record and it is signed. What it does not survive is the use it gets when it actually matters, which is always after the fact and always with somebody watching.
- You cannot show when it was written. A sheet filled in on Friday with the whole week's hours is indistinguishable from one filled in daily. Or from one filled in the day before yesterday.
- It gets lost. Four years of retention is four years of folders, office moves and boxes in a loft.
- It does not add up. Knowing how much overtime someone has this quarter means sitting down and adding it by hand, so in practice nobody knows.
- It does not match payroll. The figure ends up retyped into another sheet, and that is where the errors nobody catches come from until somebody complains.
- With people off site, it does not exist. Site, client office, home working: the sheet stays on a wall where nobody is.
What you do have to be able to show
Three things, all three at once. Any alternative that fails one of them is the same paper in another shape:
- The daily record for each person, with start and end time, day by day.
- Four years of retention, available to staff, their representatives and the labour inspectorate.
- That it cannot be rewritten after the fact. The law does not put it in those words, but it is what separates a record that proves something from a spreadsheet that merely asserts it.
Why a spreadsheet is the same paper
The natural step up from the signed sheet is a shared spreadsheet, and it is a short step: you still cannot show when each cell was written, anyone with access can change an hour from six months ago without a trace, and the file ends up in four versions in four folders. We cover it in full in The working-time record in a spreadsheet.
How to switch without running a project
The switch that works is the boring one: turn it on, tell people, and run both for a few weeks. No training, no consultancy, no Monday circled in red.
- Day 1. Upload headcount from the same spreadsheet you already have, with validation first: it tells you which rows fail and why before writing anything.
- Day 1. Everyone clocks in from their phone, or from a tablet by the door if not everyone has a work phone. Two buttons.
- Week 1. Look at who is not clocking in and remind them. The clock entries screen opens on exactly that: what was left unclosed, in amber, at the top.
- Week 2. Retire the sheet. What came before stays scanned where it was; what comes after can no longer be rewritten.
Frequently asked questions
Is a paper timesheet illegal?
No. Spanish law asks for a daily record, kept four years and available to whoever is entitled to it; it does not say on what medium. Paper meets that. What it does not meet is the hard part: showing that what is written is what was recorded at the time.
Do I have to keep the old sheets when I switch?
Yes, the four years count backwards from each recorded day. The usual approach is to scan what you have, keep it as it is, and start digital from a set date. There is no need to retype the history.
What about people without a work phone?
A tablet by the door acts as a kiosk: each person enters their PIN and clocks in. No special hardware and no tablet per person, and at Fichaloto the kiosk is not charged separately.
How long does it take to be up and running?
An afternoon to set up the account and upload headcount, and a week of running alongside paper while people get used to it. There is no data migration to do: what came before stays where it is.
What if someone forgets to clock in?
It happens every day, and it is the case that most defines a good system. In Fichaloto the person asks for the correction, someone with permission approves it, and the resulting mark is signed with who approved it. Correcting your own record is not possible: that is precisely what would take its value away.
Getting started
Fourteen full days, no card and nothing to install. If it has not saved you work by then, there is nothing to cancel. And if you would rather see it first, book a demo and we will set it up with two or three of your real projects, which is where you find out whether it fits.