Fichaloto

Blog Remote work

One record for the office days and the home days

6 min read

The fully on-site company and the fully remote one are the two rare cases. The norm is the mix, and the mix is exactly what breaks tools designed for one or the other.

The classic failure: two systems

A company that starts working remotely and already had time tracking usually ends up with the old clock for office days and a separate sheet — or a second product — for home days. From then on everything costs twice: closing the month, answering a claim, working out the remote percentage that decides whether a written agreement is required.

The percentage is the one that hurts, because it drives a legal obligation. With two systems, computing it is a manual quarterly exercise nobody does until somebody asks.

The piece that fixes it fits in one word

Have every clock-in store its mode: on site, remote, at a client, travelling. One word per entry, picked at clock-in or inferred from where it happens, which turns a single record into both records at once.

With that, the remote percentage is a division rather than a project. And the person has nothing to remember: they clock in the same way on Mondays and on Wednesdays.

Four things that become easy

  • The 30 % threshold. You see it coming months ahead, per person, and it stops being an inspection surprise.
  • Agreed office days. If the agreement says two days on site, the record says so too, with nobody keeping a separate tally.
  • Headcount in the building. Knowing how many people are coming in tomorrow becomes a query on the same data rather than a booking form.
  • Expense compensation. If it is calculated on actual remote days, the number is already there.

What not to do

Do not infer the mode from the IP address or the network alone. A corporate VPN makes home look like the office, and an office with a guest network does the opposite. The IP is a reasonable hint for proposing the mode; a poor basis for deciding it on its own.

And do not tie clocking in to the mode being “right”. If somebody comes into the office on a day marked as remote, what you have is a conversation, not a block. The record has to capture what happened, not what was planned.

Frequently asked questions

How is the 30 % calculated exactly?

Against working time over a three-month reference period, or the proportional equivalent for shorter contracts. In practice, with the mode stored on every entry it is remote hours divided by total hours for those three months.

What about split days — morning at home, afternoon in the office?

That is why the mode belongs on each entry rather than on the day: a single day can have a remote clock-in and an on-site return from the break, and the split of hours falls out on its own.

Is it useful if the company does no remote work at all?

Yes, and you would not notice: every entry stays on site and there is not one extra screen. The benefit shows up the day you start, which is usually sooner than planned.

All of this is built into Fichaloto. See how it works.

Keep reading