Fichaloto

Blog Remote work

Tracking remote work without surveilling anyone

8 min read

You can run a defensible remote working policy with no screenshots, no keystroke counts and no idea where anyone is at any given minute. What you measure is the working day and the agreed place, not the person.

The real question is not “how do I watch them”

When a company asks how to monitor remote work, it almost never means what it sounds like. It wants to be able to answer three things: that the working day is recorded exactly as it is for people in the office, that it knows where the work happens — because most jurisdictions now expect that in writing — and that if something does not add up somebody hears about it the same day rather than six months later.

None of that requires looking at anyone’s screen. And most of what is sold as “remote work monitoring” looks at someone’s screen.

What you can measure, and why it is enough

Four data points, all of them produced by the person themselves when they clock in:

  • The working day. In, breaks and out, with the same evidential weight as for anyone on site. The obligation does not soften because the chair is somewhere else.
  • The mode of each entry. On site, remote, at a client’s office, travelling. One word per entry turns a record of hours into a record that also says where they were worked.
  • The declared place. The address the person has put in writing and the employer has approved. It is not GPS: it is an agreement.
  • Whether the day matched that place. A yes or a no per day, worked out at clock-in and stored with it.

What you should not measure, even though you can

The temptation is real and the market feeds it: periodic screenshots, keystroke counts, mouse “activity” percentages, lists of open applications, continuous location tracking. All of it is technically trivial and most of it is legally expensive.

Under the GDPR the governing idea is minimisation: if the purpose — knowing the working day is kept and where it happened — can be met with a less intrusive data point, the more intrusive one is not lawful just because somebody signed a form. Works councils in most of Europe will say the same thing faster.

And there is a non-legal argument that weighs just as much: a control the workforce experiences as surveillance gets routed around. Mouse jigglers appear, laptops stay awake, goodwill evaporates. The data you collect that way measures nothing.

Where the line sits, in one sentence

You may measure performance of the contract: when the day started, how long it lasted, whether it happened at the agreed place. You may not measure the person: what they do minute by minute, what they have open, how often they touch the keyboard, or where they are when they are not working.

A practical shortcut: if the data point would not help you answer a labour inspector or pay someone correctly, you probably do not need it and it certainly creates exposure.

How it works in practice

The circuit that works has three steps, and deliberately none of them is automatic end to end.

First, the person declares it. On their own screen they write an ordinary address — street, postcode, town. Having an administrator fill those in one by one does not scale, and more importantly it turns an agreement between two parties into an administrative chore.

Second, the employer approves it. Until somebody answers, that address checks nothing. Were it live from minute one, changing your address on the day you clock in from somewhere else would be enough to silence it; and in the other direction, nobody should be flagged against a figure the employer has never looked at.

Third, the clock-in is compared against it and the verdict is stored alongside the day. If it does not match, nothing is blocked: whoever runs the team is notified, once, and decides. Blocking the clock-in would create a day with no record, which is precisely what the law does not want.

And what gets stored, which is less than people fear

An area and a town, never anyone’s front door. An approximate point, good only for saying “it matches” or “it does not”, plus the name of the town so the alert can be explained in plain language. The exact location of a home is not needed for any of the above, so it is not kept.

That matters for more than peace of mind: the only remote working policy that gets implemented without a fight is the one you can show the works council in full.

Frequently asked questions

Can I require location to be on in order to clock in?

Requiring location at the moment of clocking in is defensible where it is proportionate and properly notified, because the data point is momentary and serves a specific purpose. Continuous tracking outside that moment is a different thing entirely: that no longer measures the working day, it follows the person.

What if somebody clocks in from another town?

The healthy answer is that they clock in anyway and a flag goes to whoever runs the team. There are a hundred legitimate reasons — a trip, a family emergency, a client visit — and none of them justifies leaving somebody unable to record their day. A flag opens a conversation; a block creates a gap in the record.

Do we need a signed agreement?

In Spain, yes: written remote working agreements are required once remote work reaches 30 % of working time over a three-month reference period, and the agreement must state the chosen place of work and the means of monitoring. Elsewhere the thresholds differ, but the two clauses that matter operationally are the same two.

Is any of this useful if nobody works remotely?

Yes, and you would not notice it. Every entry stays “on site” and not one extra screen appears. The common case, in fact, is the hybrid company: some days in the office, some at home, one record that does not care which.

All of this is built into Fichaloto. See how it works.

Keep reading