Three reasons your project margin is better on screen than in the bank
If a project shows a healthy margin and the year still ends tight, the margin is not lying to you on purpose. It is missing three specific things.
One: people with no hourly cost
Every hours-based margin is hours multiplied by a cost per hour. When somebody has no cost recorded, most tools do the arithmetically obvious thing and multiply by zero. Their hours land on the project for free, and the margin improves every time they work.
This is the failure with the worst shape: it is silent, it always goes in the flattering direction, and it gets worse as you hire. The fix is not clever — put a cost on everybody — but the tool has to tell you which hours came in at zero, in the place where you read the margin, or nobody will ever go looking.
Two: one rate for everybody
The second-best version of the same mistake is a single company-wide rate. It is better than zero and it is still wrong, because the whole point of looking at project margin is to find out which mix of people makes money.
Two levels usually cover it. Each person has a default cost on their record — that is the number you maintain once a year. Then a specific project can override it for a specific person, because the subcontractor you brought in for one job does not cost what your own senior costs, and a partner working at a reduced internal rate on a strategic account is a real thing you need to be able to say.
The override matters more than it sounds. Without it, people fudge the company-wide rate to make one project look right and quietly break every other project.
Three: the expenses nobody wrote down
A project does not only cost hours. It costs a subcontractor, three licences, two flights and the lunch for the kick-off. Most tools have somewhere to store that and no screen to enter it, so in practice it never gets entered, and every project with an external cost reads better than it is.
The test is simple: can somebody add a €1,250 subcontractor line while looking at the project, in under fifteen seconds? If the answer involves a CSV import or a different module, it will not happen.
And then make the number openable
Once the inputs are right, the last problem is trust. A margin figure you cannot take apart is a figure people argue with instead of acting on. Every headline number on a project should open into its own arithmetic: which hours, at which rate, per person; which expenses; what the revenue is based on; and where each input is changed.
That is not a nice-to-have. It is the difference between a dashboard people believe and a dashboard people export to a spreadsheet and redo by hand.
Frequently asked questions
Should hourly cost be salary, or salary plus overheads?
Whatever you can maintain honestly. Fully loaded cost is more accurate and goes stale faster; gross salary divided by working hours is cruder and survives contact with reality. Pick one, write down which, and be consistent across people — a mix is worse than either.
Who should be allowed to see this?
Hourly cost is somebody's salary with the arithmetic done, so it belongs behind its own permission rather than travelling with general project access. A project manager often needs to run the work without seeing what the team costs.
All of this is built into Fichaloto. See how it works.
Keep reading
Profitability
Fixed fee or time and materials: who carries the risk
This is not a commercial preference. It is a decision about who pays if the work turns out to be bigger than anyone thought.
Profitability
A margin built from hours alone is incomplete
People cost is the one everybody measures. The other cost shows up after you have already closed the engagement.
How to choose
Twelve questions worth asking before you sign
None of these twelve questions is technical. Every one of them is answered in a sentence, and you can ask for the answers in writing before signing anything.